Skip to content

Industries · Manufacturing

Plants that keep running and deliveries that arrive on time.

In every industrial corridor: supply and deliveries on time with the control tower, every plant with its risk context, and blockades and new rules seen before they stop you.

Keep supply on time: find the 2 suppliers whose route puts the line at risk

Suppliers to one plant: on-time deliveries and route risk

  • Supplier ABajío · 180 km98 % on timeSafe route
  • Supplier BMexico City area · 220 km81 % on timeRisky route
  • Supplier CMonterrey · 690 km95 % on timeMedium route
  • Supplier DPuebla · 340 km78 % on timeRisky route
  • Supplier ESan Luis Potosí · 210 km97 % on timeSafe route
  • Supplier FGuadalajara · 280 km94 % on timeMedium route

Example with sample data

  • BASF
  • Bosch
  • John Deere
  • Linde
  • Ternium
  • Kostal
  • American Axle
  • Proeza
  • Gulfstream
  • Vasconia Brands
  • Clúster Automotriz de Guanajuato

What hits you most

Supply delaysPlants in high-incident corridorsHighway and rail blockadesExecutive travel

1 · On time

Supply and deliveries that make their appointment

Your suppliers’ trips and your own on one screen, with a warning before a delay stops the line.

2 · Plants

Every plant with its risk context

Incidents around each plant and along your staff’s commutes, by hour, for safer shifts and employee transportation.

3 · Social risk

The blockade that does not stop your line

Highway and rail blockades that cut your supply, with a warning and an alternate route before your cargo is trapped.

The line did not stop

A blockade on Highway 57 and the cargo that made its appointment

  1. 06:40Blockade detected on Highway 57, km 112
  2. 06:52Dispatch warned, alternate route via Highway 45
  3. 10:10Cargo arrives · appointment at 11:00
Without the alert: arrival at 2:30 p.m. and 3.5 hours of line downtime0 hours of downtime

Example with sample data

4 · Executives

Safe plant visits

Executives and auditors who arrive by the lowest-risk route, with tracking and an assistance button.

5 · Regulatory and political risk

Clean suppliers and rules in time

Your suppliers screened against the OFAC list and the designations, and the bills in state gazettes and the DOF (Mexico’s federal register) that touch IMMEX, nearshoring and labor.

To get started

Plants that keep running and deliveries that arrive on time.

Compliance

  • CTPAT, AEO and IMMEX (Mexico’s maquiladora export program)
  • Duty of care for executive travel

Frequently asked questions

How do I keep a blockade from stopping the line?

Blockade and protest alerts are crossed with your inbound routes and arrival times; Aliado proposes the alternate route before material runs out.

Does it protect executives and auditors on plant visits?

Yes. Route and surroundings analysis the day before the trip, and Parvada with tracking and a panic button during the transfer.

Does it connect with my staff transportation?

Yes. Staff routes are loaded like any other: risk by segment and hour, alerts and the lowest-risk route.